YARDWALL SOLAR FARM

3MW Capacity

823* Homes Powered Annually

c.1,313* TONNES OF CO2 SAVED ANNUALLY

LOCATION

The site is located 6km from Highbridge in Somerset.

KEY DATES

The Yardwall Solar park was completed and brought into operation in June 2015.

EDUCATION

Yardwall is part of The Belltown Education Programme where we provide an annual visit and renewables workshop for the children from Hayesdown Primary School, West Huntspill and East Huntspill Primary Schools. The sessions are designed to help children familiarise themselves with the technology and understand the impacts of climate change. Through this programme we aim to Inspire a future generation of children that are passionate about renewables and engineering.

Title Address Description
Yardwall Solar Farm
Manor Farm, Southwick, Mark, Highbridge TA9 4LH, UK

Installed Capacity MWac 3
Homes Powered Annually 823
Technology Description Solar

Skip to content