Projects In Development

3MW Capacity

823* Homes Powered Annually

c.1,313* TONNES OF CO2 SAVED ANNUALLY
LOCATION
The site is located 6km from Highbridge in Somerset.
KEY DATES
The Yardwall Solar park was completed and brought into operation in June 2015.
EDUCATION
Yardwall is part of The Belltown Education Programme where we provide an annual visit and renewables workshop for the children from Hayesdown Primary School, West Huntspill and East Huntspill Primary Schools. The sessions are designed to help children familiarise themselves with the technology and understand the impacts of climate change. Through this programme we aim to Inspire a future generation of children that are passionate about renewables and engineering.
Title | Address | Description |
---|---|---|
Yardwall Solar Farm | Manor Farm, Southwick, Mark, Highbridge TA9 4LH, UK | Installed Capacity MWac 3 |