Projects In Development

1 Turbine

326* Homes Powered Annually

c.520* TONNES OF CO2 SAVED ANNUALLY

0.5 MW Capacity
LOCATION
Tai hen is located in Anglesey.
KEY DATES
Construction began in 2015 and was the site was fully commissioned by November 2016.
Title | Address | Description |
---|---|---|
Tai Hen Wind Farm | Rhosgoch LL66 0AT, UK | Installed Capacity MWac 0.5 |