NEWLANDS WIND FARM

Newlands Wind Farm

1 Turbine

Newlands Wind Farm

326* Homes Powered Annually

c.520* TONNES OF CO2 SAVED ANNUALLY

0.5 MW Capacity

LOCATION

Newlands is located 7km south of Port Talbort in Wales.

KEY DATES

Construction began in October 2014 and was the site was fully commissioned by March 2015.

Title Address Description
Newlands Wind Farm
Margam, Port Talbot SA13 2PB, UK

Installed Capacity MWac 0.5
Homes Powered Annually 326
Technology Description WindTurbine