Projects In Development
2.6 MW Capacity
705* Homes Powered Annually
c.1,125* TONNES OF CO2 SAVED ANNUALLY
LOCATION
Horam is 5km south of Heathfield in East Sussex.
KEY DATES
Construction commenced in early March 2014 and the site was fully commissioned by June 2014.
Title | Address | Description |
---|---|---|
Horam Solar Farm | Horam, Heathfield TN21 0JN, UK | Installed Capacity MWac 2.6 |