Projects In Development

1 Turbine

326* Homes Powered Annually

c.520* TONNES OF CO2 SAVED ANNUALLY

0.5 MW Capacity
LOCATION
Hill House is 9km away from Bridgend in Wales.
KEY DATES
Construction began in July 2014 and the site was fully commissioned by May 2015.
Title | Address | Description |
---|---|---|
Hill House Wind Farm | St Mary Hill, Bridgend CF35 5DT, UK | Installed Capacity MWac 0.5 |