Projects In Development
19 Turbines
32,848* Homes Powered Annually
c.52,418* TONNES OF CO2 SAVED ANNUALLY
50 MW Capacity
LOCATION
The Frodsham Wind Farm is located 2km from Frodsham on marshland in Cheshire.
KEY DATES
Construction began in March 2015 and it became fully operational in February 2017.
COMMUNITY
Funding is awarded annually to The Marshes Community Benefit Fund. The fund is specifically for the benefit of the community in the local area of the wind farm located on the marshes close to the villages of Frodsham, Helsby and Elton. There has been many fantastic causes supported by the wind farm, of which you can find out more here: Marshes CBF
ENVIRONMENT
Habitats found on the site include reed beds, areas of open water, agricultural land, and areas of scrub. The site is made up of a number of cells, which are separated by earth banks. Common bird species at the site include Marsh Harriers and Black-tailed godwits. The project was awarded a CEEQUAL Excellent Whole Team Award. CEEQUAL is the sustainability assessment, rating, and awards scheme for civil engineering and the CEEQUAL assessment takes into account: ecology and biodiversity, people and community, land use and landscape and energy and carbon.
Local Liaison Committee Agendas
Local Liaison Committee Minutes
Title | Address | Description |
---|---|---|
Frodsham Wind Farm | Lordship Ln, United Kingdom | Installed Capacity MWac 50
Homes Powered Annually 32,848
Technology Description Wind Farm
|