BOTTONNETT WIND FARM

Bottonnett Wind Farm

1 Turbine

Bottonnett Wind Farm

326* Homes Powered Annually

Bottonnett Wind Farm

c.520* TONNES OF CO2 SAVED ANNUALLY

0.5 MW Capacity

LOCATION

The Bottonnett Wind Farm is site located near Launceston in Cornwall.

KEY DATES

Construction began in 2015 and was the site was fully commissioned by November 2016.

COMMUNITY

We want to have the best possible impact on the lives of local people through the provision of community funding and thoughtful interaction with local communities. At Bottonnett, funding is awaded to South Petherwin Parish Community Benefit Trust and the Lezant Parish council. The funding is allocated to many great causes including a village hall refurbishment and donations toward local allotments.

EDUCATION

Bottonett is part of The Belltown Education Programme which provides an annual visit and renewables workshop for the children from South Petherwin Primary School. The sessions are designed to help children familiarise themselves with the technology and understand the impacts of climate change and how important renewable energy is in modern day society. Through this programme we aim to Inspire a future generation of children that are passionate about renewables and careers in engineering.

Title Address Description
Bottonnett Wind Farm
Trebullett, Farm, Launceston PL15 9QA, UK

Installed Capacity MWac 0.5
Homes Powered Annually 326
Technology Description Wind Turbine

Skip to content